Project ID: MILL
Monitoring Point: K01 UNT to Mill Creek Below 3875SM37
Lat. 41-14-49 Long. 079-08-33
Coll Date Initial Final Determ pH ALK HOT A FE MN AL SO4 TSS NA
ID  Seq Collected Flow Flow Method pH units MG/L MG/L MG/L MG/L MG/L MG/L MG/L MG/L
4204 132 1/20/2000 4.2 5.6 48 10.8 21.6 0.554 465.1 <3 15.5
4204 184 2/23/2000 4.1 3.8 50 6.36 21 <.5 555 8 17.4
4204 239 3/15/2000 4.4 7 44 3.97 22.4 <.5 710.6 <3 25.6
4204 333 4/25/2000 6.1 17.2 54 2.7 20.3 <.5 696 <3 29
4204 381 5/15/2000 5.8 14.4 11.6 4.24 10.2 <.5 572.4 4 46.6
4204 436 6/15/2000 4.3 7.2 17.2 3.82 7.6 <.5 505.2 <3 50.4
4204 490 7/28/2000 3.6 0 86 9.31 18.5 <.5 489.5 10 16.7
4204 542 8/22/2000 3.8 0 80 12.6 25.3 <.5 606.4 8 24.2
4204 581 9/19/2000 3.9 0 78 12.7 21.7 <.5 565.3 <3 21
4204 644 10/19/2000 3.6 0 78 9.39 20.4 0.925 533 <3 16.4
4204 713 12/5/2000 3.6 0 82 16.9 21.5 0.717 546 10 16.9
4204 855 3/28/2001 4.3 8 58 3.42 28.8 1.9 819.4 4
4204 901 4/23/2001 6.2 18.4 3.6 1.59 20.9 <.5 626 <3
4204 934 5/3/2001 5.7 10.6 7 2.9 18.9 <.5 579.7 <3
4204 021 6/26/2001 3.7 0 75.6 5.11 17.3 <.5 515.3 12
4204 061 7/31/2001 3.5 83.6 6.41 10.7 <.5 648.1 8
4204 091 8/28/2001 3.6 0 62 6.66 12.8 <.5 458 12