Neshaminy Creek TMDL

Total Maximum Daily Load (TMDL) Assessment for the Neshaminy Creek Watersed


The files below are in Click for Information about PDF filesformat


A1.0 OVERVIEW

B1.0 HYDROLOGIC/WATER QUALITY MODELING

B1.1 Overview of Modeling Approach

B1.2 GWLF Model.

B1.3 STREAMPLAN-PA Model

B1.4 Watershed Model Calibration

B1.5 Relationship Between Dissolved Oxygen Levels, Nutrient Loads and

Organic Enrichment

C1.0 INTRODUCTION TO NONPOINT SOURCE-RELATED ASSESSMENTS


C2.0 LITTLE NESHAMINY CREEK

C3.0 LAKE GALENA

C4.0 PINE RUN


C5.0 SUB-BASIN #1 OF WEST BRANCH NESHAMINY CREEK

C6.0 SUB-BASIN #2 OF WEST BRANCH NESHAMINY CREEK

C7.0 SUB-BASIN #3 OF WEST BRANCH NESHAMINY CREEK

C8.0 SUB-BASIN #4 OF WEST BRANCH NESHAMINY CREEK


C9.0 NESHAMINY CREEK TRIBUTARY #1

C10.0 NESHAMINY CREEK TRIBUTARY #2

C11.0 NESHAMINY CREEK TRIBUTARY #3


C12.0 MILL CREEK

C13.0 CORE CREEK

C14.0 NESHAMINY CREEK SOUTH #1

C15.0 NESHAMINY CREEK SOUTH #2

C16.0 NESHAMINY CREEK SOUTH #3


C17.0 COOKS RUN

C18.0 NESHAMINY CREEK TRIBUTARY #4

EXECUTIVE SUMMARY FOR POINT SOURCE SECTION D

D3.0 APPROACH TO NUTRIENT TMDL FOR POINT SOURCES


D3.0 STREAM REACH/SUBAREA ASSESSMENTS

D3.1 Modeling Overview.

D3.2 Consideration of Critical Low Flow Conditions

D3.3 Estimation of Required Phosphorus Load Reductions

D3.4 Additional Expected Phosphorus Reductions from Non-Point Sources

D3.5 Additional Discussion on Impairments from Municipal Point Sources

D4.0 CONSIDERATION OF CRITICAL CONDITIONS

D5.0 CONSIDERATION OF SEASONAL VARIATIONS

D6.0 REASONABLE ASSURANCE OF IMPLEMENTATION

D7.0 PUBLIC PARTICIPATION

LITERATURE CITED


Appendix A. GWLF Users Manual

 


Appendix B. Streambank Erosion Calculations within AVGWLF

 


Appendix C. TMDL Information Sheet

 


Appendix D. TMDL Methodology Used in Pennsylvania

 


Appendix E. Proposed Comprehensive Stormwater Management Policy

 


Appendix F. AVGWLF Modeling Output for Sub-watersheds

 


Appendix G. EMPR Results for Selected Watersheds

 


Appendix H. Comments and Responses (New)

 


Appendix I. COMMENTS AND RESPONSES: On the First Draft (January 2003) TMDL

 


Neshaminy Creek Public Notice Document

 


Information Sheet on the Neshaminy Creek TMDL